Link: UCOP's e-newsletter

Stay Informed. Stay Connected.

Oakland employees: Franklin Building roof work starting Sept. 5

From Tuesday, Sept. 5, through Friday, Sept. 22, 2023, we will be conducting roof patching work on the upper and lower roofs of the Oakland Franklin building from 7 a.m. to 4 p.m.

Toward the end of those days (approximately the week of Sept. 11), the adhesive and patching products will have a non-harmful odor. In some work areas, it is possible that those odors could be drawn into the building. The HVAC system will be adjusted to minimize this as much as possible.

Thank you in advance for your patience during this important work. If you have any questions, contact Jihee Lee, BASC project manager, at jihee.Lee@ucop.edu.

Tags: , ,

Leave your comment here